Could Battery Storage Make Sense For Your Norfolk Business?
Two Norfolk businesses can use the same amount of electricity over a year and have very different reasons to install a battery. A workshop may use most of its power during daylight hours, when solar panels can supply some of that demand directly. A premises with refrigeration, security systems, or other equipment running after closing may have more opportunity to use stored electricity.
A battery energy storage system (BESS) lets a business store electricity for later use. For owners and property managers, the starting point is to identify the job the battery needs to do and check whether the site’s usage supports the investment.
What Problem Would The Battery Solve?
-
Using more on-site solar. Check how much electricity you export during the day and how much you import later. A battery can store some of that surplus for use after solar generation falls.
-
Shifting consumption to a cheaper period. If your tariff offers different rates by time of day, compare the savings from shifting consumption with the cost of charging the battery and the energy lost in the process.
-
Keeping essential equipment running. If continuity is the priority, list the equipment you want to keep powered and the duration you need. Backup capability and the relevant circuits need to be specified as part of the design.
What Should A Business Check Before Investing?
Start with your electricity bills and half-hourly usage data, if available. Compare working hours with evenings, weekends, and seasonal peaks. If you already have solar, include generation and export data. For a leased or multi-occupancy site, confirm which meter serves the equipment in question and who can authorise changes to the building.
An installer can then assess the supply capacity, existing wiring, battery location, and any network application needed. Ask for an itemised quote that separates equipment, electrical alterations, and optional backup. A savings estimate should show the tariff assumptions and compare the same site with and without storage. GOV.UK guidance on connecting energy devices at small businesses
Electric11’s Breckland project illustrates how the components are specified separately. The installation used a 6.2 kW solar array, a 5 kW inverter, and a 5.18 kWh battery. For another property, the right combination will depend on how much energy is available to store and what the business needs to run later. Breckland project details
Electric11 is based in Attleborough and works across Norfolk. If you manage a business premises and are considering solar, storage, or backup power, you can share your site details and electricity usage to discuss what an assessment would involve. Contact Electric11
Co.ntact
-
News Posted By:Electric11